logoWeb
address

St. Theresa Parish & School Master Plan

Palatine, IL

  • Aerial view of proposed changes to the parish campus Aerial view of proposed changes to the parish campus
  • View of new parish additions from street Parish campus master plan
  • View of new school and administration entrance View of new school floor plan
  • View of new church entrance Rendering of future church entrance
  • View of new school and administration entrance Rendering of new school and parish administration entrance
  • View of proposed pedrestrian canopy and accessible addition to the gym View of new school multi-purpose addition in courtyard
  • View of proposed accessible entrance to the gym Before view of school hall
  • View of proposed accessible entrance to the gym After view of school hall multi-purpose addition
  • View of new multi-purpose school addition in existing courtyard View of new school elementary science classroom
  • Before view of school library
  • After view of new school library
  • Before view of school kindergarten classroom
  • After view of new school kindergarten classroom
  • Aerial View of Parish Campus Before view of typical school classroom
  • After view of typical renovated school classroom
  • Before view of typical school toilet room
  • After view of renovated school toilet room
  • Before view of school corridor
  • After view of renovated school corridor
     

Recent Work

Past Experience:

The main entrances to the four existing buildings of this Parish campus were all located on the back side away from the street. A master plan was developed that proposed new accessible entrances for the church, administration, and school buildings on the street side. Phase 1 of the construction project in 2016 focused on solving annual flooding problems at the lower level of the school. Roofs for the school were re-pitched away from an outdoor courtyard and a new multi-purpose addition provides a new waterproof barrier along with much needed gathering space for the school and Parish. Interior school renovations in Phase 1 also included toilet room renovations, two new kindergarten classrooms, science and music classrooms. The Phase 2 construction in 2017 is now complet and will includes additional interior renovations to the remainder of the school, new administrative offices, faculty lounge, library, and an entrance pavilion addition with a main entrance oriented towards the street and a link between the school and administration building.

Recent Work

Past Experience:

Recent Work

Past Experience:

© 2018 Faith Environ Studio, All Rights Reserved